the correct answer to each question sections relevant to the job. Ring the office if any answer is NO.
Checked with Client
YesNo
Located First Aid
Indicate if
Good - No action requiredFair - Fan requiredPoor Contact office
Required
Under 3 metres
Over 3 metres client's scaffolder to erect
Located and marked Electricity
YesNoN/A
Gas
Others
Shoring in place
Functional. Clean. Safe
Earth Leakage install
Drill rig securely fastened
Core drop area secured
Signs display
Area safe
Barricades in position
Warning Signs displayed
Lighting in place
Traffic control
Before starting work check each point, for the equipment to be used on job. Contact the office, for instructions, if you are unable to answer YES to all safety questions.
Shaft nut is securely fastened
Yes
Belts tensioned and checked for damage
Adequate water F. waterways are clear
Rubber flaps in place
Belt & blade guards are secured in place
Flange locking nuts are tight
Guards are in place
Adequate adequate1 and waterways are clear
Tracks securely fastened
Blade secure
Job is wedged or securely supported
Pulleys fastened securely
Correct hydraulic pressure
Electric switch, plug and lead safe
Check water collar is operable
Check carnage clamp & shims are operable
No undercutting evident
No cracking in blank
All segments are secure
Plugs in good condition
Outer casing safe
Correctly tag